File entries directly to CBP
once ABI certification completes.
Stable CBP Submission prepares customs entries and CBP Form 7501 summaries for ACE, with ACE Cargo Release, PGA message sets, and accept, reject, and release status handling. ABI certification in progress (CBP CERT testing). No gluing legacy filing software together.
Testing
Built for CBP’s ABI certification path.
CBP’s ABI certification testing is the process a vendor must clear before its software can transmit live entry and entry summary data into ACE. Stable’s CBP Submission module is built against that path. ABI certification in progress (CBP CERT testing). CBP publishes the list of certified ABI vendors once testing is complete.
Six capabilities, built
for filing directly to CBP.
Every capability is built for an ABI-certified connection to ACE and the real customs vocabulary your filers use: entry types, 7501 summaries, PGA sets, statements. Not a generic integration retrofitted for trade. ABI certification in progress (CBP CERT testing).
Build entries and 7501 summaries for ACE filing.
Stable assembles entries and CBP Form 7501 entry summaries for transmission into ACE over the Automated Broker Interface once certification completes. No re-keying between systems.
Prepare ACE Cargo Release before the freight lands.
Build the pre-arrival cargo release so a “MAY PROCEED” can be in hand before arrival once the ABI connection is certified. Release and entry summary are one workflow built on the same line data, so a released shipment and its 7501 never fall out of step.
FDA, USDA-APHIS, EPA, NHTSA. Built with the entry, not after it.
Partner Government Agency data is built to ride with the entry through ACE. Prior notice, product codes, and affirmations of compliance are assembled from the same lines, validated up front, and their dispositions are designed to post to the same status feed as CBP’s.
CBP status handling, with reason codes and one-click retry.
Built so every transmission returns a response once certified. Accepts and rejects land in a status feed with the CBP reason code attached, so a rejected line is fixable on the spot. Correct the data and retransmit in place, no re-filing from zero.
Periodic Monthly Statement and duty payment, reconciled.
Duties and fees are built to roll onto the Periodic Monthly Statement (PMS) and settle through ACE on schedule once certification completes. Statement lines reconcile back to the entry summary that created them, so what CBP bills and what you filed always tie out.
Uptime monitoring and a full audit trail.
Stable keeps monitored uptime and an immutable audit trail. Every 7501, PGA set, response, and correction is retained and CBP-ready.
From built entry
to CBP response.
Four steps from assembling the entry to CBP’s real-time response, with validation before anything transmits over ABI.
Assemble the entry and its CBP Form 7501 summary.
Pull entry lines from your broker system or importer ERP, set the entry type (01, 03, 06, 11), and Stable builds the entry and the 7501 entry summary from one record, PGA data included.
Pre-file checks catch errors before CBP does.
HTS, valuation, quantities, and PGA data sets are validated against ACE edit rules up front, so the errors that would bounce a transmission are surfaced and fixed before anything reaches CBP.
Send over ABI to ACE once certification is complete.
The entry, entry summary, and PGA message sets are built for transmission into ACE through the Automated Broker Interface. Cargo release can go ahead of arrival once certification completes.
Receive release, accept, or reject in real time.
Once certified, CBP’s response (cargo release “MAY PROCEED”, entry summary accepted, or a line rejected with a reason code) posts to a status feed. Retransmit corrections in place; every version is logged.
Connects the systems your filings already run through.
Stable reads your broker software and your importers’ ERP, and transmits to CBP and the PGAs directly, so onboarding a new importer is a handoff, not an integration project.