Stable
In certificationABI certification in progress (CBP CERT testing)

File entries directly to CBP
once ABI certification completes.

Stable CBP Submission prepares customs entries and CBP Form 7501 summaries for ACE, with ACE Cargo Release, PGA message sets, and accept, reject, and release status handling. ABI certification in progress (CBP CERT testing). No gluing legacy filing software together.

See how filing works
11+
entry types filed: 01 consumption, 03 AD/CVD, 06 FTZ, 11 informal, and more
<2s
target ABI-to-ACE round trip once certified, from transmit to CBP accept or reject
9
PGA message sets wired: FDA, USDA-APHIS, EPA, NHTSA, and more
5 yr
immutable filing audit trail: every 7501, response, and correction, CBP-ready
file.stablesoftware.com / entry-summary / ENT-2026-0041987
ABI certification in progress
Entry summaryCBP 7501 · Type 01
CBP Form 7501 · Entry summary3 lines
001
8471.30.0100
Portable ADP machines
$412,650
Free
002
8517.62.0090
Transmission apparatus (WiFi)
Sec 301 · List 3
$128,900
0% + 301
003
3004.90.9228
Medicaments, retail dose
PGA · FDA
$96,430
Free
Est. duties, taxes & fees$9,667.50
ABIACE
Transmitting via ABIConnected
CBP status feed
✓
ACE Cargo Release. MAY PROCEED
SO release · Port 4601 · 14:22:08
✓
ABI transmission accepted
Entry summary · CBP Form 7501 (AE) · 14:21:54
!
FDA Prior Notice. Data under review
PGA message set · FD0 disposition pending · 14:21:37
✕
Line 002 rejected. Retransmit required
Entry summary line · 14:20:12
ERR 013 · HTS / qty mismatch
•
Duties scheduled to Periodic Monthly Statement
PMS · due the 15th · $9,667.50
ABI certification in progress●Built for ABI → ACE Filing●CBP Form 7501 Entry Summary●ACE Cargo Release●PGA Message Sets●ABI certification in progress●Built for ABI → ACE Filing●CBP Form 7501 Entry Summary●ACE Cargo Release●PGA Message Sets●
…
CBP · ABI
CERT
Testing
The credential

Built for CBP’s ABI certification path.

CBP’s ABI certification testing is the process a vendor must clear before its software can transmit live entry and entry summary data into ACE. Stable’s CBP Submission module is built against that path. ABI certification in progress (CBP CERT testing). CBP publishes the list of certified ABI vendors once testing is complete.

ABI certification in progress (CBP CERT testing)CBP CERT testingBuilt for ACE filingPGA message sets supported
What it does

Six capabilities, built
for filing directly to CBP.

Every capability is built for an ABI-certified connection to ACE and the real customs vocabulary your filers use: entry types, 7501 summaries, PGA sets, statements. Not a generic integration retrofitted for trade. ABI certification in progress (CBP CERT testing).

01: DIRECT TO CBP

Build entries and 7501 summaries for ACE filing.

Stable assembles entries and CBP Form 7501 entry summaries for transmission into ACE over the Automated Broker Interface once certification completes. No re-keying between systems.

02: CARGO RELEASE

Prepare ACE Cargo Release before the freight lands.

Build the pre-arrival cargo release so a “MAY PROCEED” can be in hand before arrival once the ABI connection is certified. Release and entry summary are one workflow built on the same line data, so a released shipment and its 7501 never fall out of step.

03: PGA MESSAGE SETS

FDA, USDA-APHIS, EPA, NHTSA. Built with the entry, not after it.

Partner Government Agency data is built to ride with the entry through ACE. Prior notice, product codes, and affirmations of compliance are assembled from the same lines, validated up front, and their dispositions are designed to post to the same status feed as CBP’s.

04: ACCEPT / REJECT

CBP status handling, with reason codes and one-click retry.

Built so every transmission returns a response once certified. Accepts and rejects land in a status feed with the CBP reason code attached, so a rejected line is fixable on the spot. Correct the data and retransmit in place, no re-filing from zero.

05: STATEMENT & DUTY

Periodic Monthly Statement and duty payment, reconciled.

Duties and fees are built to roll onto the Periodic Monthly Statement (PMS) and settle through ACE on schedule once certification completes. Statement lines reconcile back to the entry summary that created them, so what CBP bills and what you filed always tie out.

06: VENDOR-GRADE TRUST

Uptime monitoring and a full audit trail.

Stable keeps monitored uptime and an immutable audit trail. Every 7501, PGA set, response, and correction is retained and CBP-ready.

How it works

From built entry
to CBP response.

Four steps from assembling the entry to CBP’s real-time response, with validation before anything transmits over ABI.

01: BUILD

Assemble the entry and its CBP Form 7501 summary.

Pull entry lines from your broker system or importer ERP, set the entry type (01, 03, 06, 11), and Stable builds the entry and the 7501 entry summary from one record, PGA data included.

02: VALIDATE

Pre-file checks catch errors before CBP does.

HTS, valuation, quantities, and PGA data sets are validated against ACE edit rules up front, so the errors that would bounce a transmission are surfaced and fixed before anything reaches CBP.

03: TRANSMIT

Send over ABI to ACE once certification is complete.

The entry, entry summary, and PGA message sets are built for transmission into ACE through the Automated Broker Interface. Cargo release can go ahead of arrival once certification completes.

04: RESPOND

Receive release, accept, or reject in real time.

Once certified, CBP’s response (cargo release “MAY PROCEED”, entry summary accepted, or a line rejected with a reason code) posts to a status feed. Retransmit corrections in place; every version is logged.

Connections

Connects the systems your filings already run through.

Stable reads your broker software and your importers’ ERP, and transmits to CBP and the PGAs directly, so onboarding a new importer is a handoff, not an integration project.

CBP & government

ACE & PGA systems

CBP ACE (ABI / EDI)
FDA Prior Notice / PGA
USDA-APHIS
EPA
NHTSA / DOT
Your filing stack

Broker software

CargoWise
Descartes
Integration Point
Thomson Reuters
Custom ABI / EDI
Importer systems

ERP & product data

SAP S/4HANA
Oracle ERP Cloud
NetSuite
Dynamics 365
Custom CSV / API
Common questions

What filers ask us
before they transmit.

No. Stable is not yet ABI certified. ABI certification in progress (CBP CERT testing). CBP CERT testing is the vendor process required before software may transmit live entry and entry summary data into ACE. Until certification completes, CBP Submission prepares entries, 7501 summaries, PGA message sets, and status workflows for ACE filing. It does not yet transmit live to ACE.
The common formal and informal types: 01 consumption, 03 antidumping/countervailing (AD/CVD), 06 foreign-trade zone (FTZ), 11 informal, plus warehouse and temporary-import variants. Each entry carries the right entry summary data set for its type, and the CBP Form 7501 is assembled from the same record you file the release against, with no re-keying between cargo release and summary.
Yes. Partner Government Agency (PGA) message sets are built to transmit with the entry through ACE, not as a separate step afterward. FDA prior notice and product data, USDA-APHIS, EPA, and NHTSA sets are built from the same line data, validated before transmission, and their dispositions (may proceed, hold, review) are designed to land in the same status feed as the CBP response once the connection is certified.
Yes. Once ABI certification completes, ACE Cargo Release (the pre-arrival release formerly filed as the SE/entry) is built to transmit ahead of arrival so a “MAY PROCEED” can be in hand before the goods land. Release and the entry summary are handled as one workflow, so a released shipment and a summary line still under correction never drift out of sync.
Once transmitting over ABI, every transmission is designed to get a real-time CBP response. Accepts and rejects post to a status feed with the CBP reason code attached, so a rejected line is actionable immediately: fix the data and retransmit in place, no re-filing from scratch. After acceptance, post-summary corrections (PSC) and the standard correction paths are supported, with every version retained in the audit trail.

See CBP Submission in action.

Book a 30-minute filing demo. Bring a sample entry and we’ll walk build, validate, and ACE response handling end to end.